Chicago Kitchen Studio
Chicago kitchen remodeling

Load-bearing wall removal

Load-bearing wall removal uses temporary support, a sized beam and a continuous load path to the foundation under a permitted plan.

Walls, beams and layout on one of our Chicago jobs

What decides it

Beam size is only one part of the decision. Temporary support, bearing at each end and the path to the foundation must all work together before demolition begins.

Why this is worth doing properly

The wrong layout makes new finishes expensive camouflage. We draw the aisles, appliance swings, plumbing routes and structural changes first, while every inch can still be corrected without reordering a cabinet.

What you get from us

  • 01

    Solve the layout before ordering

    Aisles, appliance doors, the distance from sink to range and clearance behind the stools are drawn to scale first. Correcting the layout after cabinets arrive is no longer a design change.

  • 02

    Specify appliances before cabinets

    Every appliance comes with exact opening, ventilation and clearance requirements. Reading them before the cabinet order prevents permanent gaps, blocked doors and improvised fillers.

  • 03

    One crew throughout

    The same crew carries the job from demolition through final trim. Separately licensed plumbing, electrical and gas contractors work within the same coordinated schedule.

  • 04

    Nothing hidden without approval

    If demolition reveals structural load, a blocked drain route or old wiring, you receive photographs and a written price before the condition is covered.

136 services, one room

Load-bearing wall removal is one of 11 things we do under walls, beams and layout, and one of 136 across the whole catalogue.

Browse all services

Show us what is not working.

Send a photo and a few details. We will visit, measure and prepare a free written estimate. No obligation.

Free in-person estimates. Insured. A person answers Monday to Saturday.