Cabinet hardware installation
Cabinet knobs and pulls are drilled from a jig so their height and spacing stay consistent across every door and drawer.

What decides it
New pulls must cover any existing holes or the doors need repair first. Once the centerline is agreed, a jig keeps every bore consistent across the run.
Why this is worth doing properly
Cabinetry occupies more of the room than anything else, so the order must account for appliances, trim, fillers and corners that are not square. We set the boxes level, fasten them to framing and scribe the finish to the walls that actually exist.
What you get from us
- 01
Solve the layout before ordering
Aisles, appliance doors, the distance from sink to range and clearance behind the stools are drawn to scale first. Correcting the layout after cabinets arrive is no longer a design change.
- 02
Specify appliances before cabinets
Every appliance comes with exact opening, ventilation and clearance requirements. Reading them before the cabinet order prevents permanent gaps, blocked doors and improvised fillers.
- 03
One crew throughout
The same crew carries the job from demolition through final trim. Separately licensed plumbing, electrical and gas contractors work within the same coordinated schedule.
- 04
Nothing hidden without approval
If demolition reveals structural load, a blocked drain route or old wiring, you receive photographs and a written price before the condition is covered.
Often paired with
Everything in cabinetry, all of it ours:
136 services, one room
Cabinet hardware installation is one of 12 things we do under cabinetry, and one of 136 across the whole catalogue.
Browse all servicesShow us what is not working.
Send a photo and a few details. We will visit, measure and prepare a free written estimate. No obligation.
Free in-person estimates. Insured. A person answers Monday to Saturday.